Civil & Commercial case studies

image1-300x225

Hunter Valley Bus Depot, Edgeworth, NSW

PROJECT: Hunter Valley Bus Depot, Edgeworth, NSW CLIENT:    KCE Civil Pty Ltd SIZE: 2,700m² VALUE: $186,000.00 DURATION: 7 days Description For this project, the engineer’s design solution was to use heavy duty 80mm thick interlocking pavers, providing the client with a flexible solution to asphalt and the added strength of concrete. With approximately 80-100 bus […]

Hunter Valley Bus Depot, Edgeworth, NSW Read More »

P1010785

ATCO Structures & Logistics Facility Hope Valley WA

APC Hardstand Solutions has completed work on the ATCO Structures and Logistics facility Western Australia.  For this exciting project we are contracted to install 21,000m² to hardstand areas. This is the first facility that ATCO Structures have purchased and subsequently constructed through the design process.  ACP Hardstand Solutions offered a paved alternative to reinforced concrete, which

ATCO Structures & Logistics Facility Hope Valley WA Read More »